Engineered Gears

Testing and quality assurance

Gearbox testing, validation and quality certification

A gearbox should return to service with evidence, not assumption. Our release process combines assembly controls, a minimum four-hour no-load test and an agreed quality data pack, with client witnessing available.

Heavy industrial gearbox undergoing testing
Engineered Gears · South Africa

What we deliver

Engineering tied to the operating requirement.

  1. 01

    Minimum four-hour no-load testing

  2. 02

    Temperature, vibration and noise monitoring

  3. 03

    Oil tightness and lubrication checks

  4. 04

    Dimensional, material and NDT records

Our approach

From requirement to reliable service.

01

Define the duty and interfaces

02

Engineer the practical response

03

Manufacture or restore under control

04

Test, document and support

Typical applications

Built around real industrial duty.

Start with the duty

Tell us what the drive must do.

Share the application, power, ratio, speed, drawings, photographs or failure history available. Our engineering team will help define the next practical step.

Discuss your requirement